Solar test facility yields 1.7‐MW power
DOI: 10.1063/1.3037787
ERDA’s Solar Thermal Test Facility, at Sandia Laboratories near Albuquerque, recently produced 1.7 MW, making it the largest operational solar installation in the world, although it is still being constructed. It exceeded the 1‐MW capacity of the solar facility at Odeillo, France.
This article is only available in PDF format