Experimenters build detectors for PEP turn‐on in 1979
JUN 01, 1978
DOI: 10.1063/1.2995065
Construction of the Positron–Electron Project at SLAC is in full swing, and the $78‐million facility is expected to operate in October 1979. PEP will have 18‐GeV positrons colliding with 18‐GeV electrons in six interaction regions.
This article is only available in PDF format
© 1978 American Institute of Physics